Skip to content

Southeast Asia Supply Chain

Analysis

LEGO Opens $1.3B Vietnam Factory, 100% Renewable by 2027

LEGO opened its largest global factory in Ho Chi Minh City on April 9, 2025 — a $1.3 billion facility spanning 44 hectares (62 football fields) with 150,000 m² of floor space. Designed to run on 100% renewable energy from 2027, it features 12,400 solar panels (7.34 MWp) and targets 15,000 tonnes of annual CO₂ reduction. Concurrently, LEGO launched a LEED Gold-certified Regional Distribution Center in Đồng Nai covering 10,200 m² initially, expanding to 16,360 m² and handling 150 containers weekly. The integrated complex supports logistics across Australia, New Zealand, Japan, Singapore, Malaysia, and planned markets including Indonesia and India.

Original source: cafef.vn

LEGO Opens $1.3B Vietnam Factory, 100% Renewable by 2027

Ask SCI.AI about this story

📋 本文要点

LEGO opened its largest global factory in Ho Chi Minh City on April 9, 2025 — a $1.3 billion facility spanning 44 hectares (62 football fields) with 150,000 m² of floor space. Designed to run on 100% renewable energy from 2027, it features 12,400 solar panels (7.34 MWp) and targets 15,000 tonnes of annual CO₂ reduction. Concurrently, LEGO launched a LEED Gold-certified Regional Distribution Center in Đồng Nai covering 10,200 m² initially, expanding to 16,360 m² and handling 150 containers weekly. The integrated complex supports logistics across Australia, New Zealand, Japan, Singapore, Malaysia, and planned markets including Indonesia and India.

According to cafef.vn, LEGO officially inaugurated LEGO Manufacturing Vietnam on April 9, 2025, in VSIP III Industrial Park, Thuận An City (formerly Bình Dương Ward), Ho Chi Minh City — its sixth global factory and the largest in the world.

World’s Largest LEGO Factory

The facility represents a total investment of more than $1.3 billion USD, spans approximately 44 hectares, and covers an area equivalent to 62 football fields. Its built-up floor area exceeds 150,000 m², distributed across five main structures: administrative offices, an energy center, injection-molding and packaging zones, an automated warehouse, and auxiliary facilities. The plant is expected to generate roughly 4,000 direct jobs, making it one of the largest high-tech foreign direct investment projects in Bình Dương Province.

100% Renewable Energy & Green Certification

A defining feature is its large-scale renewable energy system: 12,400 solar panels installed across the roof generate 7.34 MWp, sufficient to power over 1,200 households annually. According to LEGO’s 2025 annual report, the factory is engineered to operate on 100% renewable energy starting in 2027, reducing CO2 emissions by approximately 15,000 tonnes per year — equivalent to the annual emissions of thousands of passenger vehicles. The office and play area buildings have achieved LEED Platinum certification, while production and high-bay warehouse blocks hold LEED Gold status.

Integrated Logistics Hub in Đồng Nai

On September 10, 2025, LEGO launched its Regional Distribution Center (RDC) in Giang Điền Industrial Park, Đồng Nai Province — the company’s fifth global RDC and its second in Asia-Pacific after Shanghai. Phase 1 covers 10,200 m² and includes a bonded warehouse and dedicated packing zone. Upon full completion, the center will expand to 16,360 m², handle more than 150 containers per week, and store up to 33,000 pallets. It achieves LEED Gold certification and derives 60–70% of its electricity from rooftop solar panels. This integrated manufacturing-logistics cluster near Ho Chi Minh City shortens delivery times, cuts transport costs, and strengthens supply chain agility across the Asia-Pacific region.

Source: cafef.vn

Compiled from international media by the SCI.AI editorial team.

Ask SCI.AI Finished reading? Continue with SCI.AI. Explore the related policy, route, company and historical context. Continue asking
Stay ahead of supply chain shifts

One email a week: the stories that matter and new risk events — in English, free.

Prefer RSS? Articles Risk events

Vietnam coffee: 70% of output lacks EUDR traceability data
Southeast Asia Supply Chain

Vietnam coffee: 70% of output lacks EUDR traceability data

A baseline review under the EU-funded SustainCoffee project finds that only about 30% of Vietnam's coffee output in 2025 came from supply chains with certification or geolocation-backed traceability, while 70% still moves through paper-based traditional channels. The EU, which took 38% of Vietnam's coffee exports in the 2025-2026 crop year, is tightening rules including the EUDR. The report also flags governance gaps: 84% of surveyed cooperatives and SMEs adopted environmental and social measures, but only 44% practice formal governance and just 1% have accessed green credit.

Vietnam logistics forum tours Quy Nhon port, Becamex VSIP
Southeast Asia Supply Chain

Vietnam logistics forum tours Quy Nhon port, Becamex VSIP

Delegates at the Vietnam Logistics Forum 2026 surveyed Quy Nhon Port and the Becamex VSIP Binh Dinh industrial park on November 6, 2026, the first day of a two-day event co-hosted by the Ministry of Industry and Trade and Gia Lai province. Quy Nhon Port, a VIMC member since 1976, operates five berths totaling nearly 1,200 m, 400 reefer plugs and about eight container vessel calls per week, and sits 165 km from Pleiku and 237 km from the Le Thanh border gate. The 1,425-hectare Becamex VSIP Binh Dinh project lies 22 km from the port and 32 km from Phu Cat Airport.

TBS Group inks $30M Indonesia factory deal for 10M pairs
Southeast Asia Supply Chain

TBS Group inks $30M Indonesia factory deal for 10M pairs

TBS Group signed an MoU with Central Java Governor Ahmad Luthfi on October 30 to invest about $30 million in an industrial production complex in the Indonesian province, a project expected to create roughly 10,000 local jobs. The footwear line is designed for 8-10 million pairs a year, with a first phase of 4-5 million pairs. The Vietnamese company surveyed India, Bangladesh and Indonesia before choosing Central Java, where it began trial operations in 2025, shipped first orders in May 2026 and opened officially on July 16, 2026. That plant targets $18 million in revenue, 2 million products and 1,600 workers by end-2026, with Vietnamese staff at 1.1%.

Welcome Back!

Login to your account below

Create New Account!

Fill the forms below to register

Retrieve your password

Please enter your username or email address to reset your password.

Scan to share via WeChat

Open WeChat and scan the QR code to share

QR Code

Add New Playlist