Explore

  • Trending
  • Latest
  • Tools
  • Browse
  • AI Assistant
  • Subscription Feed

Logistics

  • Ocean
  • Air Cargo
  • Road & Rail
  • Warehousing
  • Last Mile

Regions

  • Southeast Asia
  • South Asia
  • Central Asia
  • Japan & Korea
  • Middle East
  • Europe
  • Russia
  • Africa
  • North America
  • Latin America
  • Australia
SCI.AI
  • Supply Chain
    • Strategy & Planning
    • Logistics & Transport
    • Manufacturing
    • Inventory & Fulfillment
  • Procurement
    • Strategic Sourcing
    • Supplier Management
    • Supply Chain Finance
  • Technology
    • AI & Automation
    • Robotics
    • Digital Platforms
  • Risk & Resilience
  • Sustainability
  • Research
  • Expert Columns
  • English
    • Chinese
    • English
No Result
View All Result
  • Login
  • Register
SCI.AI
No Result
View All Result
Home Supply Chain Inventory & Fulfillment

Data Center Demand Drives 66% Surge in Gas Plant Costs

2026/04/28
in Inventory & Fulfillment, Supply Chain, Warehousing
0 0
Data Center Demand Drives 66% Surge in Gas Plant Costs

According to techcrunch.com, data center demand has driven a 66% surge in the cost to build natural gas power plants over the past two years — rising from less than $1,500 per kilowatt of generating capacity in 2023 to $2,157 per kilowatt in 2025, per a BloombergNEF report cited in the article.

Rising Costs and Delays Across the Power Infrastructure Supply Chain

The report also notes that construction timelines for new combined cycle gas turbine (CCGT) power plants have lengthened by 23%. This slowdown compounds procurement challenges: gas turbines — which constitute up to 30% of a new plant’s total cost — are facing severe supply constraints. Prices for this critical equipment are projected to reach 195% above 2019 levels by year-end, with manufacturing bottlenecks limiting scalability due to the specialized techniques required. As a result, waitlists for turbine delivery now extend into the early 2030s.

Data Centers as Accelerating Force in Electricity Demand

Data centers are among the fastest-growing electricity consumers globally. Current U.S. demand stands at 40 gigawatts, but new additions are expected to push total demand to 106 gigawatts by 2035 — a 2.7x increase. The scale of facilities is shifting dramatically: while only 10% of existing data centers are 50 megawatts or larger, the average planned facility over the next decade will exceed 100 megawatts.

Strategic Shifts Among Tech Giants

Tech companies including Microsoft and Meta have increasingly turned to on-site natural gas generation, partly in response to regulatory pressure — such as the Trump administration’s call for data center operators to “bring their own power.” However, not all firms are following this path. Google is pursuing an alternative strategy centered on renewables paired with long-duration energy storage, including Form Energy’s iron-air batteries capable of discharging electricity for up to 100 hours. Unlike gas turbines, solar panels and batteries have seen sustained cost reductions over time.

Supply Chain Implications for Global Practitioners

For global supply chain professionals, this dynamic signals mounting pressure on energy-related infrastructure procurement. Long lead times for turbines, rising capital expenditures, and public backlash against data center siting affect site selection, power sourcing strategies, and ESG reporting obligations. Utilities’ practice of passing new generation costs to end customers further complicates commercial negotiations with data center tenants and raises exposure to regulatory and reputational risk. Meanwhile, the pivot toward renewables-backed solutions introduces new dependencies — on battery raw materials, grid interconnection capacity, and storage technology suppliers — requiring updated supplier risk assessments and diversification planning.

Source: TechCrunch

Compiled from international media by the SCI.AI editorial team.

More on This Topic

  • White House EO raises IOR asset thresholds, tightens import enforcement (Jun 14, 2026)
  • Cargo Theft Surges, Rail Attacks Double to 10% in 2025 (Jun 13, 2026)
  • Los Angeles port handles 950,000 TEUs in July amid tariff frontloading (Jun 13, 2026)
  • Air freight rates up 32.7% YoY amid AI demand, Gulf capacity gaps (Jun 13, 2026)
  • Gatik inks multi-year autonomous freight deal with PepsiCo (Jun 13, 2026)
ShareTweet

Related Posts

White House EO raises IOR asset thresholds, tightens import enforcement
AI & Automation

White House EO raises IOR asset thresholds, tightens import enforcement

June 14, 2026
1
Cargo Theft Surges, Rail Attacks Double to 10% in 2025
AI & Automation

Cargo Theft Surges, Rail Attacks Double to 10% in 2025

June 13, 2026
4
Los Angeles port handles 950,000 TEUs in July amid tariff frontloading
AI & Automation

Los Angeles port handles 950,000 TEUs in July amid tariff frontloading

June 13, 2026
3
Air freight rates up 32.7% YoY amid AI demand, Gulf capacity gaps
AI & Automation

Air freight rates up 32.7% YoY amid AI demand, Gulf capacity gaps

June 13, 2026
2
Gatik inks multi-year autonomous freight deal with PepsiCo
Manufacturing

Gatik inks multi-year autonomous freight deal with PepsiCo

June 13, 2026
0
Shipping industry fights talent shortage amid 2M-seafarer workforce
Manufacturing

Shipping industry fights talent shortage amid 2M-seafarer workforce

June 13, 2026
2

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recommended

Digital Platforms and SaaS in Modern Supply Chain Transformation: How Source Logistics’ IFS Softeon Deployment Redefines Scalable 3PL Operations

Digital Platforms and SaaS in Modern Supply Chain Transformation: How Source Logistics’ IFS Softeon Deployment Redefines Scalable 3PL Operations

12 Views
March 25, 2026
AI Migration and Supply Chain Resilience: Seven Strategic Signals Reshaping Global Manufacturing in 2026

AI Migration and Supply Chain Resilience: Seven Strategic Signals Reshaping Global Manufacturing in 2026

14 Views
March 2, 2026
Coupa, Miebach Unify Supply Chain Design, Planning, Execution

Coupa, Miebach Unify Supply Chain Design, Planning, Execution

12 Views
May 9, 2026
美台贸易协议落地:关税封顶15%,台积电2500亿美元投资迎重大利好

US-Taiwan Trade Agreement Takes Effect: 15% Tariff Cap Benefits TSMC’s $250 Billion Investment

16 Views
February 15, 2026
Show More

SCI.AI

Global Supply Chain Intelligence. Delivering real-time news, analysis, and insights for supply chain professionals worldwide.

Categories

  • Supply Chain Management
  • Procurement
  • Technology

 

  • Risk & Resilience
  • Sustainability
  • Research

© 2026 SCI.AI. All rights reserved.

Powered by SCI.AI Intelligence Platform

Welcome Back!

Sign In with Facebook
Sign In with Google
Sign In with Linked In
OR

Login to your account below

Forgotten Password? Sign Up

Create New Account!

Sign Up with Facebook
Sign Up with Google
Sign Up with Linked In
OR

Fill the forms below to register

All fields are required. Log In

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Scan to share via WeChat

Open WeChat and scan the QR code to share

QR Code

Add New Playlist

No Result
View All Result
  • Supply Chain
    • Strategy & Planning
    • Logistics & Transport
    • Manufacturing
    • Inventory & Fulfillment
  • Procurement
    • Strategic Sourcing
    • Supplier Management
    • Supply Chain Finance
  • Technology
    • AI & Automation
    • Robotics
    • Digital Platforms
  • Risk & Resilience
  • Sustainability
  • Research
  • Expert Columns
  • English
    • Chinese
    • English
  • Login
  • Sign Up

© 2026 SCI.AI